Chevron Pure Natural

Key Features

  • Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Dimension

600X120X15/4mm

Pack

0.720m2/ctn 8kg