Chevron Sauvignon

Key Features

  • Key Features; Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Dimension

600 x 120 x 15/4 mm

Pack

0.720m2 / Ctn, 8kgs