Herringbone Sauvignon

Key Features

  • Key Features; Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Dimension

  • 15mm Herringbone: 600 x 120 x 15/4 mm
  • 21mm Herringbone: 600 x 120 x 21/6 mm

Pack 

  • 15mm Herringbone: 0.720m2 / Ctn, 8kgs
  • 21mm Herringbone: 0.576m2 / Ctn, 8Kgs