Herringbone Storm

Key Features

  • Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Dimension

  • 15mm Herringbone: 600 x 120 x 15/4 mm

Pack 

  • 15mm Herringbone: 0.720m2 / Ctn, 8kgs