Cannes

Key Features

  • ABCD Grade Engineered European Oak.
  • Easy care and maintenance, allergy free.
  • Matte finish, timeless look.
  • T & G profile can be installed as either direct stick or floated by a professional installer.
  • VOC: Toxic Free Water Based Matte Coating E1

Dimension

2200 x 220 x 21/6mm

Pack 

1.936sqm/ctn, 4 pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear