Champagne

Key Features

  • ABCD Grade Engineered European Oak. AB Grade also available, check stock.
  • Easy care and maintenance, allergy free.
  • Matte finish, timeless look.
  • T & G profile can be installed as either direct stick or floated by a professional installer.

AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals, (Higher Price Applies).

Dimension

2200 x 220 x 21/6mm

Pack 

1.936sqm/ctn, 4 pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear

VOC
Toxic Free Water Based Matte Coating E1