Raw

Key Features

    • ABCD Grade Engineered European Oak. AB Grade also available, check stock. Clean grade, limited knots & sapwood.
    • T&G Square Edge profile can be installed as either direct stick or floated by a professional installer.

AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals, (Higher Price Applies).

Dimension

2200 x 220 x 21/6mm, 1.936m2 /Ctn 26 Kgs
1900 x 190 x 15/4mm, 1.805m2/ Ctn  19Kgs

Pack 

1.805 sqm/ctn, 5pcs

1.936m2, 4 Pcs

Finish

Raw Uncoated

Warranty

Limited Lifetime Structural, 20 years Domestic Wear