Key Features
AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals, (Higher Price Applies).
Dimension
2200 x 220 x 21/6mm
1900 x 190 x 15/4mm
Pack
220mm, 1.936m2/Ctn, 4 Pcs
190mm, 1.805m2 / Ctn, 5 Pcs
Finish
Matte
Warranty
Limited Lifetime Structural, 20 years Domestic Wear