Natural Blackbutt

 

Dimension

1520 x 180 x 6.5mm – 22.5Kgs

Warranty

  • 25 Year Limited Lifetime Structural Warranty
  • 20 Year Limited Lifetime Residential Wear Warranty Residential
  • 5 Year Limited Lifetime Commercial Warranty