Onyx

Dimension

1520 x 228 x 7.5mm – 2.080m2 / Ctn – 16Kgs – 6pcs

Pack

Sqm/Ctn: 2.080
Planks/Ctn: 6
Ctns/Pallet: 76
Micro Bevel: Yes 4 sides

Finish

Realistic timber visuals, colours, and textures. Water based PU Matte coating.

Warranty

  • 25 Year Limited (Lifetime) Structural Warranty
  • 20 Year Limited Lifetime Residential Wear Warranty Residential
  • 5 Year Limited Lifetime Structural Warranty Commercial