Forest

Laminate Flooring

Aquastop is produced by the Swiss Krono Group one of the World’s largest and most respected laminate manufacturers. Aquastop is an innovative laminate technology that delivers a unique set of qualities that is engineered to inhibit moisture ingress from topical liquid spills, water and pet accidents. With your ‘Peace of Mind’ as a central focus, the 8 & 12mm range allows for moisture exposure for up to 48 hours and the 14mm range presents with 72 hour protection. These time frames will certainly help if the unexpected does happen. Note: Refer specific install requirements for bathrooms and laundry.

Aquastop laminate is produced to strict World class European standards allowing for healthy living, emissions are the same as you would expect from timber in its natural state. It poses no health risks and makes it highly suitable for young children who spend a lot of time in contact with the floor. In addition its superior abrasion cl. Ac5/33 scratch and impact resistance make it an ideal choice where pets are involved. Swiss Krono laminate products are produced from 100% natural materials with timber sourced from FSC certified forest resources.

Aquastop laminate for Swiss precision, reliability and performance.

Benifits

Natural Resources, Child and Pet Friendly, Suitable for Wet Mopping

Dimension

2025 x 244 x 14mm

Pack

1.482 m2/ctn

Finish

AC5

Warranty

35 Year Limited Structural Warranty
5 Year Limited Commercial Warranty