Classic Oak

Dimension

AVAILABLE IN 2 SIZES.

Width: 193mm, Thickness: 12mm, AC4, Plank Size: Length 2200mm, Pack Qty: 1.698m²

Width: 193mm, Thickness: 8mm, AC3, Plank Size: Length 1215mm, Pack Qty: 1.895m²

Pack

  • 12mm – 1.698m2 / Ctn | 8mm – 1.8954m2 / Ctn