Brazilian Oak

  • 65% Gloss Finish.
  • AC3 Surface Rating.
  • 4 sides Micro Bevel.
  • Easy to install Clic System (Licensed by Flooring Industries).
  • Reinforced balance layer enhances stability.
  • Authentic timber visuals.

Benifits

VOC: E1

Dimension

1215 x 125 x 12.3mm

Pack

1.518m2 / Ctn 16Kgs

Finish

65% Semi Gloss

Warranty

Limited Lifetime Structural
Limited 20 Year Coating