Outback

Engineered to exacting standards. Manufactured from environmentally certified resource. Extremely stable with excellent wear resistance, reduced expansion and contraction when compared with solid strand woven bamboo. Wear layer can be refurbished and rejuvenated if required.

Benifits

  • UV Matte Finish
  • Hand Scraped
  • Easy Click Lock

Dimension

1850 x 142 x 14mm

Pack

Size: 1.576m2 / Ctn 15.8 Kgs

Pcs/Ctn: 6

Finish

Surface: Rustic

Micro Bevel: Yes 4 Sides