Blackbutt

Key Features

  • Extremely stable with excellent wear resistance
  • Genuine Australian Eucalyptus wear layers over a stable Plywood structural core.
  • VOC Emissions :< E1 (Below World Health Organisation Levels).
  • AS/NZS 2013 R10 & P3
  • Janka Hardness scale 9.1 kN

Dimension

1860 x 136 x 14/3mm

1860 x 189 x 14/3mm

Pack 

136mm – 1.518m2 / Ctn, 16Kgs.

189 – 2.1098m2 / Ctn, 21.5Kgs