Golden Bloom

Key Features

  • American Red Oak – Pre-finished colour.
  • AB grade, high – spec, clean look.
  • Matte finish, timeless look.
  • T & G profile can be installed as either direct stick or floated by a professional installer.

1900 x 190 x 14/3mm

Pack

2.166m2 / Ctn – 19Kgs