HB-Dark Brown

  • ABCD Grade Engineered European Oak.
  • Easy care and maintenance, allergy free.
  • Matte finish,  timeless look.
  • T & G profile can be installed as either Direct Adhesive Fixed or Floating installation by a professional installer
  • VOC; E1, toxic free water based PU coating.

Dimension

2200 x 220 x 21/6mm Nested Shorts
1900 x 190 x 15/4mm Nested Shorts

Pack 

220mm,1.936m2/Ctn, 4 Pcs.
190mm,1.805m2/Ctn, 5 Pcs

Finish

Matte PU water based coating.

Warranty

Limited Lifetime Structural Warranty, 20 Years Residential Wear