Heritage Grey

Key Features

    • ABCD Grade Engineered European Oak.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

Dimension

1900 x 190 x 15/4mm

Pack 

1.805 sqm/ctn, 5pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear