Herringbone Seafoam

3mm Oak wear- layer & multi-layer plywood core.

Key Features

  • Engineered to exacting standards.
  • Manufactured from environmentally sustainable resource.
  • Extremely stable with excellent wear-resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Grade & Surface

A/B/C Hi-SPEC Visual Grade, less knots for a cleaner look. Allows for natural features such sapwood, raised grain and colour variation that enhance natural character. Visual appearance will suit those seeking a clean natural grade for their installations. Pre-finished, Matte PU Lacquer. Surface is light wire brushed.

Size & Length

600mm set length. 120 x 14/3mm, 0.864m2/Ctn

Profile

Tongue & Groove & Micro Bevelled edges.

Slip Resistance

In accordance with AS/NZS 4586, P3

VOC Emission

< E1, (BelowWorld Health Organisation Levels)

Fire Test Data

AS/ISO9239.1.Critical Radiant Flux, kW/m2.7.5 kW/m2 Mean Smoke Development,17 percent minutes

Warranty

  • 25 Year Limited (Lifetime) Structural Warranty
  • 20 Year Limited Residential Wear Warranty
  • 5 Year Limited Commercial Wear Warranty