Latte

Key Features

    • ABCD Grade Engineered European Oak. AB Grade available, limited colours, check stock.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals (Higher Price Applies).

14mm Click Range – Latte colour is known as Cafe Latte.

Dimension

220mm x 21/6mm

190mm x 15/4mm

190mm x 14/2mm

Pack 

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear