Marble

Key Features

  • ABCD Grade Engineered European Oak.
  • Easy care and maintenance, allergy free.
  • Matte finish, timeless look.
  • T & G profile can be installed as either direct stick or floated by a professional installer.
  • VOC: Toxic Free Water Based Matte Coating E1

Dimension

2200 x 220 x 21/6mm

1900 x 190 x 15/4mm

Pack 

220mm, 1.936m2/Ctn, 4 Pcs

190mm, 1.805m2 / Ctn, 5 Pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear