Northern Blackbutt

Dimension

1830 x 178 x 7.6mm – 1.920m2 / Ctn – 20Kgs

Warranty

  • 25 Year Limited (Lifetime) Structural Warranty Residential
  • 20 Year Limited Lifetime Wear Warranty Residential
  • 5 Year Limited Structural Warranty Commercial