Onyx

Key Features

    • ABCD Grade Engineered European Oak.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

14mm Click, Onyx colour also known as Ebony Brown.

Dimension

1900 x 160 x 12/3mm

1900 x 190 x 14/2mm

Pack 

160 x 12/3mm 1.824 sqm/ctn & Weight 15Kgs

190 x 14/2mm 2.166 sqm/ctn 6pcs Weight 19Kgs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear