Parana

Key Features

    • ABCD Grade Engineered European Oak & AB Grade available, check stock.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals, (Higher Price Applies) .

14mm Click Range – Parana colour is known as Smoke White.

Dimension

2200 x 220 x 21/6mm T&G

1900 x 190 x 15/4mm Click and T&G

1900 x 190 x 14/2mm Click

Pack 

220mm x 21mm 1.936m2/Ctn, 4 Pcs

190mm x 15mm 1.805m2 / Ctn, 5 Pcs

190mm x 14mm 2.166m2 / Ctn, 6 Pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear