3mm Oak wear- layer & multi-layer plywood core.
Key Features
Grade & Surface
A/B/C Hi-SPEC Visual Grade, less knots for a cleaner look. Allows for natural features such sapwood, raised grain and colour variation that enhance natural character. Visual appearance will suit those seeking a clean natural grade for their installations. Pre-finished, Matte PU Lacquer. Surface is light wire brushed.
Size & Length
1900mm set length with nested shorts. 190 x 14/3mm, 2.166m2/Ctn
Profile
Tongue & Groove & Micro Bevelled edges.
Slip Resistance
In accordance with AS/NZS 4586, P3
VOC Emission
< E1, (BelowWorld Health Organisation Levels)
Fire Test Data
AS/ISO9239.1.Critical Radiant Flux, kW/m2.7.5 kW/m2 Mean Smoke Development,17 percent minutes
Warranty