Prestige Oak White Sands

Key Features

    • ABCD Grade Engineered European Oak.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

14mm Click, White Sands colour also known as Bondi Beach.

Dimension

1900 x 190 x 15/4mm

1900 x 190 x 14/2mm Click

Pack 

190 x 15/4mm 1.805 sqm/ctn, 5pcs

190 x 14/2mm 2.166 sqm/ctn 6pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear