Rustic Natural

Key Features

  • Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent hardness and wear resistance
  • Wear layer can be refurbished and rejuvenated if required
  • Janka Hardness scale 9.5kN

Dimension

189mm width, 14mm thickness. 1900mm length (nested shorts) 2mm Solid Hickory wear layer.

PackĀ 

Size: 2.155m2 / Ctn 20.5Kgs