Straw

Key Features

    • ABCD Grade Engineered European Oak. AB Grade also available, check stock.
    • Easy care and maintenance, allergy free.
    • Matte finish, timeless look.
    • T & G profile can be installed as either direct stick or floated by a professional installer.
    • VOC: Toxic Free Water Based Matte Coating E1

AB Grade is a higher visual grade with less knots and natural characteristics than our standard ABCD range, it’s ideal for those seeking clean, uncluttered lines to enhance interior design visuals, (Higher Price Applies).

Dimension

2200 x 220 x 21/6mm

1900 x 190 x 15/4mm

Pack 

220mm, 1.936m2/Ctn, 4 Pcs

190mm, 1.805m2 / Ctn, 5 Pcs

Finish

Matte

Warranty

Limited Lifetime Structural, 20 years Domestic Wear