Wide Plank Ash Grey

Key Features

  • Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

 

Dimension

1900 x 220 x 15/4mm

PackĀ 

2.09m2/ carton, 22Kgs