Wide Plank French Lace

Key Features

  • New Range, Extra Wide 240mm width – ABC Grade.
  • Engineered to exacting standards.
  • Manufactured from environmentally certified resource.
  • Extremely stable with excellent wear resistance.
  • Wear layer can be refurbished and rejuvenated when required.

Dimension

240mm width, 15mm thickness, 2200mm length (nested shorts)

Pack 

2.112m2 / ctn.