Winter Frost

Key Features

  • White Ash – Pre-Finished Color.
  • AB grade, high – spec, clean look.
  • Matte finish, timeless look.
  • T & G profile can be installed as either direct stick or floated by a professional installer.

Dimension

1900 x 190 x 14/3mm

Pack

2.166m2 / Ctn – 19Kgs