Epoxy flooring Sydney for garages, warehouses and retail spaces
An epoxy floor in Sydney typically takes 3–5 days to install end-to-end (grind, prime, level, base coat, top coat, cure), with light foot traffic possible 24 hours after the final coat.
Epoxy floor failures almost always trace back to bad preparation. Our Sydney epoxy service grinds the slab, tests moisture, primes correctly, and pours a self-levelling base before applying the right epoxy system for your wear environment — garage, warehouse, kitchen, or retail.
What this service delivers
- Diamond grinding to CSP profile for guaranteed adhesion
- Moisture and substrate testing before primer selection
- Solvent-free, chemical-resistant epoxy systems with cure-time scheduling
Frequently asked questions
- How long does an epoxy floor last in Sydney?
- A correctly prepared epoxy system lasts 8–15 years in residential garages and 5–10 years in commercial environments, depending on traffic and chemical exposure.
- Why do epoxy floors peel?
- Peeling is almost always a preparation failure: missed grinding, residual moisture, or wrong primer. Our standard scope tests for all three before any product goes down.
- Can you do epoxy over old tile or paint?
- Old tile and paint must be removed and the slab ground back. We include this in scope rather than coating over compromised substrates.
- How long until I can drive on a Sydney epoxy garage?
- Light foot traffic 24 hours after the final coat; vehicle traffic typically 5–7 days, depending on the system and ambient temperature.