Floor levelling cost Sydney — per square metre pricing and inclusions

Sydney floor levelling typically costs $35–$90 per square metre for materials and labour, with self-levelling on a sound substrate at the lower end and deep screed or magnesite removal at the higher end.

Floor levelling cost in Sydney depends on substrate condition, depth of pour, and access — not just floor area. This guide gives transparent per-m² ranges, lists what's typically included and excluded, and shows worked examples for common Sydney rooms so you can compare quotes confidently.

What this service delivers

  • Per-m² ranges for self-levelling, screed, and substrate repair
  • Worked examples for apartment, terrace, and family-home rooms
  • Transparent inclusions and exclusions to compare quotes fairly

Frequently asked questions

How much does floor levelling cost per m² in Sydney?
Typical ranges: self-levelling on a sound substrate $35–$60/m²; deep screed or repair pours $60–$90/m²; magnesite removal plus levelling $120–$200/m².
What's included in a Sydney floor levelling quote?
A complete quote includes substrate inspection, moisture testing, primer, compound, mixing and pouring labour, waste removal, and dust extraction.
What's usually excluded?
Demolition (tile removal, magnesite removal), structural repair, plumbing alterations, and the next finish are generally separate scope items quoted alongside levelling.
How do I compare two quotes fairly?
Check pour depth, primer specification, compound brand, included demolition, and dust extraction — these are the most common reasons quotes vary widely.