Tile removal Sydney with dust-extracted demolition and adhesive grind-back
Sydney tile removal generally runs at 15–25 m² per day per operator, including dust-extracted demolition, full adhesive grind-back, and skip-bin loading.
Tile removal is more than chiselling — without proper adhesive removal and substrate repair, the next finish will fail. Our Sydney crews use dust-extracted electric breakers, grind back the bedding compound, and patch the slab so it's ready for tile, vinyl, timber, or self-levelling without delays.
What this service delivers
- Dust-extracted tile demolition suitable for occupied buildings
- Full adhesive and screed grind-back to a CSP-profiled slab
- Waste removal and substrate documentation for the next trade
Frequently asked questions
- How long does tile removal take in Sydney?
- Most Sydney bathrooms (4–6 m²) take half a day; full apartment floors (60–90 m²) usually take three to five days including grind-back.
- Is dust-free tile removal really dust-free?
- It is dust-extracted rather than dust-free. HEPA vacuums capture more than 99% of airborne particles at the source, and the area is HEPA-cleaned afterwards.
- Will you also remove the adhesive?
- Yes. Adhesive grind-back is included so the slab is finish-ready. Many cheaper quotes leave bedding in place, which causes the next finish to fail.
- Do you provide waste removal?
- Yes — skip-bin coordination and protected egress are part of the standard scope.