There’s nothing more frustrating. Your flooring project is on the home stretch. The self-levelling compound has been poured, you’re expecting a perfectly smooth, hard surface, but instead, you find soft, tacky spots that refuse to cure. In a climate as unique and challenging as New South Wales, from the humid coast of Sydney to the varied inland regions, this is an all-too-common headache for tradies and DIYers alike.

So, what’s going wrong? Is it the product, the preparation, or is the infamous Sydney humidity playing saboteur with your project?

At Elyment Group, we’ve seen it all. Let’s dive into the common culprits behind self-levelling compound not hardening and give you a clear, actionable plan to achieve that flawless, rock-solid finish every time.

Why is My Self-Leveller Still Soft? The Common Culprits

Before you blame the product, let’s investigate the process. The hardening of a cementitious self-levelling compound is a chemical reaction (hydration), not just a drying process. Several factors, especially prevalent in NSW, can throw this delicate balance off.

The Climate Factor: Sydney’s Humidity Trap

High humidity is public enemy number one for curing floors. When the air is already saturated with moisture, the water in the levelling compound can’t evaporate effectively. This slows the chemical hydration process to a crawl, leading to extended curing times and persistent soft spots. A winter pour on a cold, damp day can be just as problematic as a sticky summer afternoon.

The Water Ratio Woe

It might be tempting to add a little extra water to make the compound flow better, but this is a critical mistake.

Always follow the manufacturer’s specifications to the letter. Measure your water precisely.

Subfloor Sabotage: Contaminants and Moisture

Your self-leveller is only as good as the surface it’s applied to. A poorly prepared subfloor can completely derail the curing process.

The Primer Problem

Skipping the primer is a false economy. Primers are crucial for two main reasons:

  1. They seal porous surfaces, preventing the subfloor from sucking the water out of the mix too quickly.
  2. They act as a bonding agent, ensuring the leveller adheres powerfully to the subfloor.

Using the wrong type of primer, or applying it incorrectly, can be as bad as using none at all.

Your Troubleshooting Checklist: A Step-by-Step Guide

Found a soft spot? Don’t panic. Work through this checklist to diagnose the issue.

  1. Assess the Environment: Check the room’s temperature and humidity. If it’s too humid or cold, introduce a dehumidifier or industrial fan (once the surface has set enough not to be marked by the airflow) and gentle heating to create a more controlled environment.
  2. Check Your Mix: Were the water ratios exact? Was the product within its use-by date? Old product can lose its chemical potency.
  3. Investigate the Subfloor: If possible, check the areas around the soft spots. Does the subfloor look different? Could there have been a spill or contamination you missed?
  4. Review the Product Specs: Double-check the technical data sheet (TDS) for the product. Note the specified curing times based on temperature and humidity. You might just need to give it more time in NSW’s challenging conditions.

When to Call in the Experts

Sometimes, a soft spot is a symptom of a deeper issue, like excessive hydrostatic pressure from the slab or a fundamental product incompatibility. Trying to fix it without a proper diagnosis can lead to a bigger, more expensive failure down the line.

If you’re facing a flooring dilemma that has you stumped, it’s time to bring in the professionals. The team at Elyment Group specialises in diagnosing and resolving complex flooring challenges across NSW. We provide precision solutions to ensure your project stands on a solid foundation.

Key Takeaways

Don’t let soft spots sink your project. With the right preparation and knowledge, you can achieve a perfect floor, every time. You can find us on X as @ElymentGroup or visit our website at elyment.com.au.

Get a Flawless Floor Finish