Bathroom floor levelling Sydney with correct falls to drains

Sydney bathroom floor levelling typically takes 1 day, with sand-cement screed used to create a 1:80 to 1:100 fall to the drain followed by waterproofing and tile installation.

Bathroom floors must drain — and that means correct falls, waterproofing-compatible substrates, and tile-bond preparation. We deliver Sydney bathroom levelling with engineered falls, waterproofing-ready primers, and substrate flatness suited to large-format tile.

What this service delivers

  • Engineered falls to drains (1:80 to 1:100 standard)
  • Waterproofing membrane-ready substrate prep
  • Large-format tile flatness tolerances

Frequently asked questions

What's the correct bathroom floor fall?
Standard NSW practice is 1:80 to 1:100 falls to floor wastes; shower areas typically use a 1:80 fall.
Can you work with my waterproofer?
Yes. We coordinate substrate handover so the waterproofing membrane bonds correctly and dries before tiling.
Is screed or self-levelling better for a bathroom?
Sand-cement screed is preferred for creating falls; self-levelling can be used over a screeded base for finish flatness.
How long until I can tile?
Standard screed cures sufficiently for tiling within 24–72 hours depending on depth and conditions.