Self-levelling compound Sydney — application, brands and cure times
Self-levelling compound in Sydney is typically poured 3–10 mm deep over a primed substrate, accepting tile and vinyl finishes within 24 hours and timber within 48–72 hours.
Self-levelling compound is the standard solution for thin floor corrections — but only when substrate prep, primer selection, and pour technique are right. We apply premium-brand self-levelling compounds across Sydney with documented moisture testing and finish-compatible specifications.
What this service delivers
- Premium-brand compounds (Ardex, Mapei, Sika) selected for substrate
- Documented moisture testing and primer specification
- Finish-compatible cure timing for tile, vinyl, and timber
Frequently asked questions
- Which brands of self-levelling compound do you use?
- We specify Ardex, Mapei, or Sika compounds depending on substrate, depth, and finish — each has strengths in different applications.
- How deep can self-levelling compound be poured?
- Standard compounds pour 3–30 mm in a single lift; deeper builds are layered or use a sand-cement screed base.
- What's the cure time?
- Foot traffic in 2–4 hours, tile and vinyl in 24 hours, and timber in 48–72 hours subject to moisture testing.
- Do I need to prime the substrate?
- Yes — primer ensures bond and prevents pinholes; primer brand is matched to compound and substrate.